Language
  • 繁體中文
  • 日本語
  • About
    • Introduction
    • History
    • Location
  • Scope of Work
  • Performance
    • TRC
    • MRT
    • HSR
  • Partnership
  • Contact
Performance
  1. Home
  2. Performance
  3. HSR
  • 2018-2020年

    THSR 700T

    Commissioned by TOSHIBA CORPORATION, executed electronic substrate reinforcement and life extension project of 700T power system, which was completed in TeLung electronic substrate repair room in Kaohsiung.
    view more
  • 2018-2019年

    THSR 700T

    Commissioned by National Chung-Shan Institute of Science and Technology (NCSIST), implemented equipment installation for automatic measurement system for train cab shake.
    view more
  • 2017-2018年

    THSR 700T

    Construction of additional AC 110V charging equipment for barrier-free seats in 700T carriage.
    view more
  • 2017年

    THSR 700T

    Installation of Wi-Fi network equipment in carriage.
    view more
  • 2016年

    THSR 700T

    Commissioned by Industrial Technology Research Institute (ITRI), executed 4G Wi-Fi network test equipment project for carriage.
    view more
  • 2015-2017年

    THSR 700T

    Construction of nursing rooms and improvement of charging equipment in carriages (First Taiwanese manufacturer carried out interior renovations on trains).
    view more
  • 2014年

    THSR 700T

    Commissioned by TOSHIBA CORPORATION, executed M4 maintenance contract.
    view more
  • 2014-2016年

    THSR 700T

    Commissioned by TOSHIBA CORPORATION, executed train air-conditioning maintenance service contract.
    view more
  • 2008-2012年

    THSR 700T

    Commissioned by KOITO ELECTRIC INDUSTRIES, LTD., executed switchboards, relay additions, and circuit renovation and maintenance.
    view more
  • 2007-2014年

    THSR 700T

    Commissioned by TOSHIBA CORPORATION, executed maintenance and warranty of electrical system (main circuit, auxiliary power supply, on-board computer, air-conditioning).
    view more
  • 2005-2006年

    THSR 700T

    Sent technical staff to THSR base to cooperate with TOSHIBA CORPORATION 's engineers for preparation, transformation and testing of new trains.
    view more
  • 2004年

    THSR 700T

    Dispatched technical staff to TOSHIBA CORPORATION 's Fuchū factory for professional training on electrical system and on-board monitoring equipment of 700T.
    view more
  • About
  • Scope of Work
  • Performance
  • Partnership
  • Contact
COPYRIGHT © 2021 TE LUNG TRADING CO.,LTD. ALL RIGHTS RESERVED. DESIGN-VIPCASE